BMC50610 CC Spec_Rev 0.doc - Power Generation Consulting

Two (2) 100% capacity flue gas recirculation air blowers shall be provided as
well as associated valves, control valves, and NH3/air mixer for each skid.

Part of the document


EPC SAMPLE SPECIFICATION Typical of work package by Power Generation Consulting
01/13/2012 STATEMENT OF WORK AND
SPECIFICATIONS
Issued for RFP
Revision 0
CURRANT CREEK POWER PROJECT
BLOCK 2
CURRANT CREEK POWER PROJECT - BLOCK 2
TABLE OF CONTENTS
SECTION 1.0 -
INTRODUCTION................................................................
.................................1-1
1.1 GENERAL PLANT DESCRIPTION
...........................................................................
........... 1-1 1.1.1
Specifications...........................................................
...............................................1-2 1.1.1.1
General................................................................
............................................................ 1-2 1.2 OVERALL SCOPE
DESCRIPTION................................................................
............. 1-3 1.2.1 General
Scope....................................................................
....................................1-3 1.2.2 Work by
Others...................................................................
....................................1-4 1.2.3 Terminal
Points...................................................................
....................................1-5 1.2.3.1 345 kV
Switchyard.............................................................
.............................................. 1-5 1.2.3.2 Natural Gas
.......................................................................
..............................................1-6 1.2.3.3 Water
Supply.................................................................
.................................................. 1-6 1.2.3.4 Process Waste Water
Discharge..............................................................
....................... 1-6 1.2.3.5 Telephone and Data Communications
.......................................................................
..... 1-6 1.2.4 Owner Furnished Equipment and Systems
............................................................ 1-7 1.2.5 Noise Levels
.........................................................................
.................................. 1-7 1.2.5.1 Equipment Noise
Requirements...........................................................
........................... 1-7 1.2.5.2 Indoor Noise
Limits.................................................................
......................................... 1-8 1.2.5.3 Far Field Noise Guarantees
.......................................................................
..................... 1-9 1.2.6 Mechanical
Scope....................................................................
............................... 1-9 1.2.7 Electrical Scope
.........................................................................
........................... 1-10 1.2.8 Instrumentation and Control Scope
...................................................................... 1-
11 1.2.9 Civil
Scope....................................................................
........................................1-11 1.2.10 Structural and Architectural Scope
.......................................................................
1-12 1.2.11 Construction Facilities and
Services.................................................................
....1-12 1.2.11.1
General................................................................
.......................................................... 1-12 1.2.11.2
Coordination...........................................................
....................................................... 1-14 1.2.11.3 Safety
.......................................................................
..................................................... 1-15 1.2.11.4 Security
.......................................................................
.................................................. 1-16 1.2.11.5 Fire Protection
.......................................................................
........................................ 1-16 1.2.11.6
Cleanliness............................................................
........................................................1-17 1.2.11.7 Signs and Barricades
.......................................................................
............................. 1-17 1.2.11.8 Dust Control
.......................................................................
........................................... 1-17 Exhibit A i 06/03/05 Rev. 0
1.2.11.9 Open Burning
............................................................................
.................................... 1-18
1.2.11.10 Cooperation with Other
Contractors.................................................................
.... 1-18
1.2.11.11 Energized
Facilities..................................................................
............................ 1-18
1.2.11.12 Reference Points
............................................................................
..................... 1-18
1.2.11.13 Dangerous
Materials...................................................................
......................... 1-19
1.2.11.14 Waste
Disposal....................................................................
................................ 1-19
1.2.11.15 Hazardous Material
Management..................................................................
...... 1-20
1.2.11.16 Adjoining
Utilities...................................................................
............................... 1-20
1.2.12 Production
Inputs......................................................................
............................1-20
1.2.13 Operating Consumables
............................................................................
........... 1-21
1.3 PLANT OPERATING PROFILE
............................................................................
.... 1-21
1.3.1 Plant Load
Definition..................................................................
........................... 1-21
1.3.2 Plant Operating
Profile.....................................................................
..................... 1-22
1.3.3 Plant Operating Philosophy
............................................................................
...... 1-23
1.3.4 Plant Reliability
............................................................................
......................... 1-23
1.3.5 Plant Performance
............................................................................
.................... 1-23
SECTION 2.0 - DESIGN
CONDITIONS..................................................................
.....................2-1
2.1 GEOTECHNICAL CONDITIONS
............................................................................
.... 2-2
2.2 SITE SECURITY
............................................................................
............................. 2-2
2.3 SITE
ACCESS......................................................................
....................................... 2-2
2.4
SITEENVIRONMENT.............................................................
....................................2-3
SECTION 3.0 - CODES, STANDARDS, AND
REGULATIONS.................................................. 3-1
SECTION 4.0 - ENGINEERING SCOPE
............................................................................
............ 1
4.1 GENERAL REQUIREMENTS
............................................................................
............ 1
4.1.1 Architectural
Design......................................................................
.......................... 4-3
4.1.2 Civil / Structural
Design......................................................................
..................... 4-3
4.1.3 Mechanical
Design......................................................................
............................ 4-4
4.1.4 Electrical Design
............................................................................
......................... 4-5
4.1.5 Instrumentation and Controls Design
..................................................................... 4-6
4.2 DESIGN REVIEWS
............................................................................
......................... 4-7
4.3
DRAWINGANDSPECIFICATIONREQUIREMENTS.........................................
.......4-7
4.3.1 Drawing and Specification Schedule
...................................................................... 4-8 4.3.2 Drawing and Specification Submittals
.................................................................... 4-8
Exhibit A ii 06/03/05 Rev. 0
4.3.3 Plant Manual and Instruction Books
.............................