EU-Turkey NUTSII Grant Scheme

The total maximum contract price shall be euros. 3.2 The .... Mass spectrometer is
a detector used for confirmation of analyzes on GC and besides it is used for
scan of the library of unknown samples. 2 ... The device consists of three main
units like GC/MS: Quartet Gradient pump, detector and data analyses system.
Pump ...

Part of the document


Content of Procurement dossier for Supplies
The procurement dossier consists of an invitation letter and a tender
dossier: . Invitation letter
. Tender dossier
o Part A: Instructions to tenderers
o Part B: Draft contract and special conditions, including
annexes . Annex I: General Conditions for supply contracts
. Annex II: Technical Specifications
. Annex III: Technical offer (to be tailored to the
specific project)
. Annex IV: Budget breakdown
. Annex V: Forms o Part C: Other Information . Glossary
. Administrative compliance grid
. Evaluation grid o Part D: Tender Form for a Supply Contract . Tenderer's Declaration(s) CORUM GOVERNORSHIP, SPECIAL PROVINCIAL ADMINISTRATION,
ÇORUM,2006
Our ref.: TR 0305.02/SSI/004-03 SUBJECT: INVITATION TO TENDER FOR: Supply of Equipment under the project titled "Preventing contamination
of Derincay" Further to your enquiry regarding the publication of the above-mentioned
invitation to tender, please find enclosed the following documents, which
constitute the tender dossier: Part A. INSTRUCTIONS TO TENDERERS
1. SUPPLIES TO BE PROVIDED
2. TIMETABLE
3. PARTICIPATION
4. ORIGIN
5. TYPE OF CONTRACT
6. CURRENCY
7. LOTS
8. PERIOD OF VALIDITY
9. LANGUAGE OF OFFERS
10. SUBMISSION OF TENDERS
11. CONTENT OF TENDERS
12. PRICING
13. ADDITIONAL INFORMATION BEFORE THE DEADLINE FOR SUBMISSION
OF TENDERS
14. CLARIFICATION MEETING / SITE VISIT
15. ALTERATION OR WITHDRAWAL OF TENDERS
16. COSTS OF PREPARING TENDERS
17. OWNERSHIP OF TENDERS
18. JOINT VENTURE OR CONSORTIUM
19. OPENING OF TENDERS
20. EVALUATION OF TENDERS
21. SIGNATURE OF THE CONTRACT AND PERFORMANCE GUARANTEE
22. TENDER GUARANTEE
23. ETHICS CLAUSES
24. CANCELLATION OF THE TENDER PROCEDURE
25. APPEALS Part B. DRAFT CONTRACT AND SPECIAL CONDITIONS, INCLUDING ANNEXES
DRAFT CONTRACT
SPECIAL CONDITIONS
ANNEX I GENERAL CONDITIONS
ANNEX II TECHNICAL SPECIFICATIONS
ANNEX III TECHNICAL offer (to be tailored to the specific
project)
ANNEX IV BUDGET BREAKDOWN (model financial offer)
ANNEX V FORMS Part C. FURTHER INFORMATION
GLOSSARY
ADMINISTRATIVE COMPLIANCE GRID
EVALUATION GRID Part D. TENDER FORM FOR A SUPPLY CONTRACT
For full information about procurement procedures please consult the
Practical Guide to contract procedures for EC external actions, which can
be downloaded from the following web pages: http://europa.eu.int/comm/europeaid/tender/index_en.htm the RD-SKE Programme Web site http://www.skekalkinma.org.tr Any request for clarification must be received by the Contracting Authority
in writing at least 21 days before the deadline for submission of tenders.
The Contracting Authority will publish, on the the RD-SKE Programme Web
site http://www.skekalkinma.org.tr, a reply to tenderers' questions at
least 11 days before the deadline for submission of tenders. If the
Contracting Authority, either on its own initiative or in response to a
request from a tenderer, provides additional information on the tender
dossier, it will send such information in writing to all tenderers at the
same time. Costs incurred by the tenderer in preparing and submitting the tender
proposals will not be reimbursed. We look forward to receiving your tender and the accompanying tender
guarantee at the address specified in the Instructions to Tenderers before
25 January 2007 at 14.00 hrs local time Yours sincerely, FAZIL TURKYILMAZ TENDER DOSSIER Part A. Instructions to tenderers
PUBLICATION REF.: TR 0305.02/SSI/004-03 In submitting a tender, the tenderer accepts in full and without
restriction the special and general conditions governing this contract as
the sole basis of this tendering procedure, whatever his own conditions of
sale may be, which he hereby waives. Tenderers are expected to examine
carefully and comply with all instructions, forms, contract provisions and
specifications contained in this tender dossier. Failure to submit a tender
containing all the required information and documentation within the
deadline specified will lead to the rejection of the tender. No account can
be taken of any reservation in the tender as regards the tender dossier;
any reservation will result in the immediate rejection of the tender
without further evaluation. A glossary of the terms used here is included in Part C of this tender
dossier.
1. Supplies to be provided
1.1 The subject of the contract is the manufacture, delivery,
installation, commissioning, maintenance, by the Contractor of the
following goods: Item 1. Gas chromatography mass spectrometer equipment (GC/MS)
(1 unit) Item 2. High performance licit chromatography equipment (HPLC)
(1 unit) Item 3. Atomic absorption spectrophotometer (AAS) ( 1 unit) Item 4. 10 KW permanent power supply (1 unit) in 1 lot to at the location: ?l Kontrol Laboratuar? Mudurlugu,
Hidirlik Caddesi No:170, Corum, TURKEY, DDP (delivered duty paid) in
70 days. 1.2 The supplies must comply fully with the technical specifications set
out in the tender dossier (technical annex) and conform in all
respects with the drawings, quantities, models, samples, measurements
and other instructions. 1.3 N.A. 2. Timetable
| |DATE |TIME* |
|Clarification meeting / site |< Not applicable > |< Not |
|visit (if any) | |applicable > |
|Deadline for request for any |04.01.2007 |14.00 hrs local|
|clarifications from the | |time |
|Contracting Authority | | |
|Last date on which |12.01.2007 |14.00 hrs local|
|clarifications are issued by | |time |
|the Contracting Authority | | |
|Deadline for submission of |25.01.2007 |14.00 hrs local|
|tenders | |time |
|Tender opening session |25.01.2007 |14.30 hrs local|
| | |time |
|Notification of award to the |05.02.2007 |- |
|successful tenderer | | |
|Signature of the contract |09.02.2007 |- | * All times are in the time zone of the Turkey
( Provisional date 3. Participation
3.1. Participation is open on equal terms to all natural and legal persons
participating either individually or in a grouping (consortium) of
tenderers of the Member States and Turkey, to natural and legal
persons from the EU candidate countries and countries benefiting from
the financial and technical measures to accompany the reform of
economic and social structures in the framework of the Euro-
Mediterranean Partnership (MEDA) and the CARDS programme. All goods
supplied under this contract must originate in these countries. For
full list see Procurement Notice. 3.2. These terms refer to all nationals of the said states and to all
legal entities, companies or partnerships constituted under, and
governed by, the civil, commercial or public law of such states and
having their statutory office, central administration or principal
place of business there. A legal entity, company or partnership having
only its statutory office there must be engaged in an activity which
has an effective and continuous link with the economy of the state
concerned. 3.3. These rules apply to:
a) tenderers
b) members of a consortium
c) any subcontractors. 3.4. Natural persons, companies or undertakings meeting the conditions set
out in section 2.3.3 of the Practical Guide to contract procedures for
EC external actions are excluded from participation in and the award
of contracts. Otherwise they risk exclusion from contracts and grants
in accordance with section 2.3.5 of the Practical Guide. Tenderers or
candidates who have been guilty of making false declarations will also
incur financial penalties representing 10% of the total value of the
contract being awarded. That rate may be increased to 20% in the event
of a repeat offence within five years of the first infringement. 3.5 To be eligible for participation in this tender procedure, tenderers
must prove to the satisfaction of the Contracting Authority that they
comply with the necessary legal, technical and financial requirements
and have the wherewithal to carry out the contract effectively. 4. Origin
4.1. Supplies must originate in a country m